The quality of the ton bag directly affects the subsequent market development of the ton bag manufacturer, so it is essential to conduct a certain quality inspection before the product leaves the factory. Learn about two effective quality inspections for big bags before they leave the factory.
The first is a stress test. Put the full-load ton bag on the press machine for pressure test. The pressure applied by the press machine is four times the full-load weight of the ton bag. The static load method may be used, that is, the self-weight of the four-layer full-load bag, and the pressurization time is eight hours. Above, in this test, the contents do not overflow and the bag body is not damaged, which means that the large bag has passed this test.
The second is the drop test. Lift the full-load ton bag with lifting equipment. The bottom of the bag is more than 0.8m away from the ground, and then drop it straight down to the solid and flat ground. If the contents do not overflow and the ton bag body is not damaged, it means that after this item test.
After learning the effective inspection methods of these two ton bags, you will definitely buy more satisfactory products in the subsequent shopping malls, and I hope to help you.
