The quality of ton bags directly affects the subsequent market development of enterprises, so it is essential to conduct certain quality inspections before the products leave the factory. Learn about the two effective quality inspections used before ton bags leave the factory.
Pressure test
Put the fully loaded ton bag on the pressurizer for a pressure test. The pressure applied by the pressurizer is four times the full load of the ton bag, or the static load method is used, that is, the dead weight of four layers of fully loaded bags. The pressurization time is more than eight hours. In this test, the contents do not overflow and the bag body is not damaged, which means that the ton bag has passed this test.
Drop test
Lift the fully loaded ton bag with a lifting device, with the bottom of the bag more than 0.8m above the ground, and then drop it vertically to a solid and flat ground. If the contents do not overflow and the ton bag body is not damaged, it means that the test has been passed.